TAB-Deck™


TAB-Deck™ is a solution for completely replacing the welded mesh in metal decking applications used in multi-storey construction. Steel fibres are hereby contributing as well to the shrinkage control of the concrete as to the bearing capacity in hogging moment areas.



The advantages are numerous:

  • Interesting time savings
  • Significantly reduced crane times
  • Safer job-sites as workers cannot get trapped by installed mesh
  • Reduced storage space required on the ground which is particularly interesting in urban environment
  • No heavy storage of welded mesh directly on the installed decking on each storey


Typical fibre dosage rates are from 30 to 35 kg/m³. TAB-Deck™ allows for fire ratings up to two hours. Spans can reach up to 4.5 m in function of the loading, the chosen metal decking profile and the slab thickness.



TAB-Deck™ has been granted the "SCI assessed" mark by the Steel Construction Institute in the UK.



  Click here to go to the Download Center
ProjectCountryProject typeFibre typeDosage
(kg/m³)
Résidence Tiers Temps La MadeleineFRRefurbishmentHE+ 1/6030
Parking CHLLUOpen carparkTabix 1.3/5035
Ings RoadUKSocial HousingHE 1/5030
Aintree Race courseUKNew Grandstands and Media CentreHE 1/5030
Doncaster Race courseUKNew StandsHE 1/5030
3 Piccadilly PlaceUKMulti-Storey OfficesHE 1/5030
Propect parkUKOffice BuildingHE 1/5030
Cardinal Newman CollegeUKStudent HousingHE 1/5030
St Mary Walk Campus East Riding CollegeUKEducation BuildingHE 1/5050
Quorum Business ParkUKMultiple Office BuildingsHE 1/5030
River LightsUKEntertainment ComplexHE 1/5030
Hartlepool HealthcareUKHealth CentreHE 1/5030
Selby CollegeUKEducation BuildingHE 1/5030
Bingley HealthcareUKHealth centerHE 1/5030