TAB-Deck™


TAB-Deck™ is a solution for completely replacing the welded mesh in metal decking applications used in multi-storey construction. Steel fibres are hereby contributing as well to the shrinkage control of the concrete as to the bearing capacity in hogging moment areas.



Numerous advantages

  • Interesting time savings
  • Significantly reduced crane times
  • Safer job-sites as workers cannot get trapped by installed mesh
  • Reduced storage space required on the ground which is particularly interesting in urban environment
  • No heavy storage of welded mesh directly on the installed decking on each storey


Typical fibre dosage rates are from 30 to 35 kg/m³. TAB-Deck™ allows for fire ratings up to two hours. Spans can reach up to 4.5 m in function of the loading, the chosen metal decking profile and the slab thickness.



TAB-Deck™ has been granted the "SCI assessed" mark by the Steel Construction Institute in the UK.


ProjectTypeFibreDosage
(kg/m³)
Résidence Tiers Temps
La Madeleine, France
RefurbishmentHE+ 1/6030
Parking CHL,
Luxembourg
Open carparkTabix 1.3/5035
Ings Road,
United Kingdom
Social HousingHE 1/5030
Aintree Race course,
United Kingdom
New Grandstands
and Media Centre
HE 1/5030
Doncaster Race course,
United Kingdom
New StandsHE 1/5030
3 Piccadilly Place,
United Kingdom
Multi-Storey OfficesHE 1/5030
Propect park,
United Kingdom
Office BuildingHE 1/5030
Cardinal Newman College,
United Kingdom
Student HousingHE 1/5030
St Mary Walk Campus
East Riding College,
United Kingdom
Education BuildingHE 1/5050
Quorum Business Park,
United Kingdom
Multiple Office BuildingsHE 1/5030
River Lights,
United Kingdom
Entertainment ComplexHE 1/5030
Hartlepool Healthcare,
United Kingdom
Health CentreHE 1/5030
Selby College,
United Kingdom
Education BuildingHE 1/5030
Bingley Healthcare,
United Kingdom
Health centerHE 1/5030


Powered by aware